let us get to it. looking at the bay bridge first year it we are backed up to the edge of the macarthur maze. most of the heavy traffic of 880 approach is confined to the right line. heading to the open toe and the toll plaza. where we saw stopping the conditions of the last hour on highway 92 the san mateo bridge we do not now. it is a better ride. a lot of people have bailed out to the dumbarton bridge because the nimitz southbound is quite heavy. the golden gate bridge looks great. a beautiful drive for marin county and the problems across the span. >> as we look at the traffic maps i told you at 80 west bound heavy commute to 26-27 minutes with the ride from hercules to berkeley. . the san ramon telecommute is low. 101, 280, 85 of the major routes and the south bay heavy not heavier than usual but good about the spirit in the guadalupe parkway is low. the marin ride is close to 41 minutes from the bottle to the golden gate bridge. the heaviest traffic is confined south of highway 37. james. >> than